Airbus A320 Final Assembly Line in Tianjin completed building and delivering 10 A320 planes at the first five months of this year. It will deliver another 26 planes at the end of 2010.
“Airbus A320 final assembly line has been achieved a lot since opened. At present, the final assembly line manufactured 2 planes every month, and the number will continuously increase. We are confident to build 4 planes each month in 2012,” Jean-Luc Charles, General Manager of Airbus Tianjin Final Assembly Line said.
Airbus Tianjin Final Assembly Line delivered the 10th A320 plane to Shenzhen AirLines on 26 May, which is the 36th A320 plane for Shenzhen AirLines.